Woodside Petroleum Ltd|  Developments 45
FEED Entry
2019 FID
Calliance and
Brecknock
FPSO RFSU
2026 Torosa
FPSO RFSU
2027
AUSTRALIA
Browse to NWS Project development concept (not to scale)
In October 2018, the BJV referred the Browse to NWS Project
to the Western Australian Environmental Protection Authority
and the Commonwealth Department of the Environment and
Energy. The referrals are the initial step in the environmental
approvals process for the development.
To support the design of the subsea pipelines, a metocean survey
campaign commenced in Q1 2019 to capture current, temperature
and turbidity data along the proposed pipeline route.
Developing Browse through existing Woodside-operated
infrastructure will deliver a globally competitive project for the
benefit of governments, the local community, titleholders and
infrastructure owners.
Woodside interest: 30.6% (Browse)
NORTH RANKIN COMPLEX
NORTH RANKIN
COMPLEX
KARRATHA GAS PLANT
KARRATHA GAS
PLANT
BROWSE FPSO
FACILITIES
BROWSE FPSO
FACILITIES
PROPOSED
EXISTING
SCOTT REEF WATERS
late
2020
Woodside target schedule