Woodside Petroleum Ltd|  Developments 43
Pluto LNG Train 2
Woodside’s preferred development option is to process
Scarborough gas through a brownfield expansion of
Pluto LNG. The expansion will include construction of a
second LNG train with a capacity of approximately 5 Mtpa
and installation of domestic gas infrastructure to increase
capacity to approximately 225 TJ/d.
The Scarborough reservoir characteristics are well matched to
the Pluto LNG basis of design. Pluto LNG was originally designed
to allow ecient brownfield development and third-party gas
processing. Existing primary environmental approvals for Pluto
LNG allow for two LNG trains and supporting infrastructure.
An area for a second train was pre-prepared with the foundation
project in 2007-2008. Minimal further earthworks are required
for Pluto LNG Train 2.
In December 2018, Woodside awarded Bechtel the contract
to complete FEED for Pluto LNG Train 2, with the option for
the full execute phase contract subject to a positive FID.
Woodside is targeting FID in 2020 and downstream RFSU
in 2024.
Pluto LNG Train 2 Woodside interest: 100%
Scarborough and Pluto LNG Train 2 development concept (not to scale)
FEED
2019 FID
2020 Scarborough
RFSU
2023 Pluto LNG
Train 2 RFSU
2024
Woodside target schedule
SCARBOROUGH FLOATING
PRODUCTION UNIT
SCARBOROUGH PIPELINE
SHORE CROSSING
PLUTO LNG TRUCK
LOADING FACILITY
PLUTO LNG
PLUTO LNG
TRAIN 2
DOMESTIC GAS
INFRASTRUCTURE
PLUTO-NWS
INTERCONNECTOR
TO KARRATHA
GAS PLANT
PLUTO PLATFORM
~430km TO PLUTO LNG ~190km TO PLUTO LNG
PROPOSED
EXISTING